Martin Meadows, Cropper Road

Our site team are part way through ‘Phase Three of a large housing development by Wain homes consisting of 1, 2, 3, 4 & 5 bedroom homes on the ‘Marton Meadows site near Blackpool. Plumbing works first began on site in July 2015 and are ongoing.

Phase three of this project was awarded to Rothwell Plumbing Services in mid-2018 and was based on our plumbers previous outstanding performance on site covering quality of workmanship, health & safety record and timely completion of all works on phases one and two which were completed in 2018. Our workforce assigned to this site, has provided ongoing dependability for Wain homes and has ensured a consistency of relevant knowledge and experience which has been carried forward into each new property opened up for works. This continuity has helped provide consistency of quality for our client on site.

Our work comprises the installation of all first and second fix general plumbing to bathrooms and kitchens and throughout each home, wet gas central heating systems with high ‘A rated high efficiency boilers with panel radiators and all above ground drainage and rainwater systems. Our consistent delivery of quality, reliability and subsequent on time delivery of every plot, has ensured each new phase of work on this development has been awarded to Rothwell Plumbing Services Ltd.


Project Details


ADDRESS

Cropper Rd, Blackpool, FY4 5YB


CLIENT

Wain Homes


WORKS

Plumbing, Drainage, Kitchen & Bathroom Installations, Rainwater Harvesting


VALUE

£875,000.00







— RELATED CASE STUDIES
Didsbury High School

Didsbury High School

Rothwell Building Services on behalf of the RPS Group Ltd have completed works on Didsbury High School with BAM Construction in South Manchester. We’re very proud to have worked with BAM

View Case Study
Barrow Dock Museum ERDF Funded PV Installation

Barrow Dock Museum ERDF Funded PV Installation

We delivered a quick turnaround PV installation for our client Barrow Borough Council to the Barrow Dock Museum. The works formed part of the installation of PV systems for their ERDF funded PV

View Case Study
Broughton Hub

Broughton Hub

RPS were commissioned by Salford City Council to produce a Stage 3 design package associated with modifications to the heating and hot water systems at the Broughton Hub in Salford in association

View Case Study


This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.