Rothwell Plumbing Services have been appointed under the NEPO233 Framework to provide the complete design, supply & install of Solar PV to Tofts Farm Depot.

Tofts farm depot is the main maintenance hub for Hartlepool Borough Council housing the headquarters for the council’s refuse & recycling operations, as well as the facility being used to service, repair, and test the council’s fleet of over 250 vehicles. This project was selected by Hartlepool Borough Council as part of its decarbonisation programme.
 

We have successfully installed 277 solar panels to Tofts farm, completed within a 2 week delivery period. The project was delivered In 4 stages:

  • Stage 1 – Mounting kit installation

  • Stage 2 – Optimiser installation

  • Stage 3 – DC cabling

  • Stage 4 – Panel installation

Following a structured programme ensured a safe and efficient project delivery.

Works on site commenced in February and achieved practical completion in 2 weeks. Our delivery team was made up of 7 operatives in total: 5 undertaking roof works and 2 dedicated to electrical works.

All required components were procured prior to mobilisation, meaning there were no supply delays to impact the programme.
 

Products Installed:
  • Panels – Longi 535w LR7-60HVD-535W

  • Inverter – SolarEdge SE100K

  • Optimisers – 139 × SolarEdge S1000

  • Mounting – SFlex Trapezoidal Steel Roof Fixing


Challenges

The pre-installation roof survey identified a number of defects, RPS Group carried out roofing repair works to maximise the operational lifespan of the PV system. This eliminated the need for separate procurement and ensured that the roof repairs and PV installation ran smoothly ahead of project commencement.

Hartlepool Borough Council have a Net Zero target of 2050. SolarEdge remote monitoring was activated prior to work commencement allowing Hartlepool Borough Council to track real time energy production from day one. The installation is set to reduce CO₂ Emissions by 23.62 tonnes/year supporting Hartlepool Borough Council’s aim to improve energy efficiency and increase sustainable energy.

Project Details


ADDRESS

Tofts Farm Depot


CLIENT

Hartlepool Borough Council


WORKS

Solar PV installations








— RELATED CASE STUDIES
Parklands Homes, MH Stainton Homes

Parklands Homes, MH Stainton Homes

The Parklands development by our client, MH Stainton Homes, comprises of three, four, and five bedroom luxury countryside villas set in Caton village within Littledale. The villas are located in an

View Case Study
Storage Heater Replacement, Housing21

Storage Heater Replacement, Housing21

We recently undertook a project for national social housing provider Housing21. RPS were awarded a contract to replace old electric night storage heaters with new gas carcasses and new gas central

View Case Study
Solar PV, Housing21

Solar PV, Housing21

We recently undertook a contract for PV Solar installations to 69 social housing occupied bungalows in Oldham, on behalf of our client Housing21 The works included the preparatory works, structural

View Case Study


This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.