Barrow Dock Museum PV Installation- Barrow Borough Cup undertook a survey, design and full installation.

Panels were mounted in an ‘on roof configuration using a mounting system which was supplied complete. Panels were butted tight together, wind and snow loading was accounted for using the procedures in BS EN 1991-1 and BRE digest 489 for both the central and edge zones and RPS took into account both the live and dead load factors of safety.

RPS had to Verify that the roof was capable of supporting the weight of the solar system, using our structural engineers calculations. We used purpose-designed PV cabling, and kept cable runs as short as practicable. Armour core was used for the external accessible cabling. It was important to ensure we could provide sufficient ventilation behind the PV array for cooling and internally to permit inverters to dissipate heat.

We had to comply with the manufacturers instructions and recommendations about the types of roof constructions with which the PV may be integrated and about the provision of weatherproof installations, ensuring all roof penetrations were sealed properly with sealing methods approved by the roofing industry.

Working closely with the client we were able to discuss and agree positions of equipment in locations identified.

 The photovoltaic installation was equipped with suitable circuit protection and switchgear, circuit protection was installed to meet the requirements of the current 18th Edition of the Wiring Regulations. All internal cable runs were contained within suitable trunking / conduit. All external cable runs were securely clipped at regular intervals to ensure a tight, close fit with the external wall.

RPS undertook all making good works resulting from the installation and provided all handover documentation to the client. We also provided a detailed  handover pack to the  Dock Museum explaining the technology and how to maximise fuel bill savings. The project was delivered on time and on budget.

Project Details


ADDRESS

Barrow- in- Furness, Cumbria


CLIENT

Barrow Borough Council


WORKS

Commercial Mechanical & Electrical


VALUE

£102k





Beverly Coverdale, Low Carbon Barrow, Barrow Council, said

"RPS Group installed a PV system to our Dock Museum in Barrow in Furness. As a Council we had challenging aspirations to reduce greenhouse gas emissions from our Buildings through the Low Carbon Barrow programme. The Dock Museum is free entry and is sited at the head of a listed Dock structure.

RPS ensured this installation went to plan against some challenging timescales and within the planning consents given. They worked with us to ensure public access to the building was not affected and gave advice on both the works in hand and potential storage solutions.

As the installation was funded we were very grateful to have it completed on time and to the budget agreed."




— RELATED CASE STUDIES
Tofts Farm Depot - Solar PV

Tofts Farm Depot - Solar PV

Rothwell Plumbing Services have been appointed under the NEPO233 Framework to provide the complete design, supply & install of Solar PV to Tofts Farm Depot. Tofts farm depot is the main maintenance

View Case Study
Central Square, Leeds

Central Square, Leeds

PwC is the largest professional services firm in the UK which has had a presence in Leeds since 1925. Proud of the links to the wider community and the support of public and private sector

View Case Study
Martin Meadows, Cropper Road

Martin Meadows, Cropper Road

Our site team are part way through ‘Phase Three of a large housing development by Wain homes consisting of 1, 2, 3, 4 & 5 bedroom homes on the ‘Marton Meadows site near Blackpool. Plumbing works

View Case Study


This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.