The Grange ASHP Installation – Blackpool Council – Blackpool

As part of the Grange Park housing estate sustainability and carbon reduction project, RPS undertook the design, supply, and installation of a commercial air source heat pump (ASHP) system to replace the existing gas boilers in the @thegrange building. 

 
@thegrange is a multi-use community site, comprising a community building, community shop, café, pharmacy, and a One stop shop.

In response to the global climate emergency, Blackpool Council took a proactive stance by declaring a climate emergency on June 26, 2019. With a commitment to carbon neutrality and the use of clean energy throughout its services by 2030, the council aims to address its 3% contribution to Blackpools carbon emissions. Collaborating with local partners and residents, the council embarked on initiatives to bring about significant changes. The Grange Park sustainability and carbon reduction project comprises a number of projects to enhance energy efficiency, reduce carbon emissions, and improve the communitys resilience to climate change including: 

  • Housing improvement retrofit works to reduce energy consumption

  • @thegrange renewables project

  • Tree Planting

  • Cycle works

  • Eco Coaching 

RPS selected two Mitsubishi CAHV-P500YB-HPB 3-phase ASHP units for the project. These units were integrated with the existing Cylon Building Management System (BMS) to optimise the efficiency and control of the heating system. This choice of equipment and integration allowed for effective climate control while aligning with the councils clean energy goals.

RPS collaborated closely with Blackpool Council to deliver a high-quality installation within the prescribed timeframe. The coordinated efforts ensured that the projects goals were achieved. The successful integration of the ASHP system, combined with existing solar energy infrastructure, has yielded impressive results for The Grange community centre.


Project Details


ADDRESS

Blackpool, Lancashire, FY3 7RW


CLIENT

Blackpool Council


WORKS

Commercial


VALUE

£130k






"So far, @thegrange community centre has been self-sustaining for the past 3 months, with no electricity or gas consumption charges. RPS Group has an excellent, knowledgeable, professional, and timely service."
 
Andrew Duckett,
Service Manager, Blackpool Council




— RELATED CASE STUDIES
Alexandra Road

Alexandra Road

Award winning developer, ‘Adlington in partnership with ‘Bardsley Construction have recently completed an £11.5 million luxury development of 55 retirement apartments at Alexandra Road, just a short

View Case Study
Boiler Replacement Scheme Onward Homes

Boiler Replacement Scheme Onward Homes

RPS are currently delivering a Boiler Replacement programme for Onward Housing. The contract covers over 400 properties in the Hyde area and is due to be completed in March 2022. We’re really

View Case Study
Willows Edge, Wrea Green

Willows Edge, Wrea Green

The Willows Edge development by our client Story Homes, comprises two, three, four and five bedroom ‘Prestige Specification Homes and a small number of social housing properties at Wrea Green which

View Case Study


This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.